English>>

800-ton ethylene tower started loading and shipping in Tianjin

2019-10-31 12:25

On the morning of October 23, the Tianjin-based ethylene steam cracker with a diameter of 6m, a length of 90m and a weight of 800 tons, the 1010-C-40 ethylene tower was dispatched at Pier 18 and kicked off the ceremony and the successful completion of the loading task at Dagukou Port Area, Harbor Area, Tianjin Port Free Trade Zone. It is claimed that this is the largest equipment that Tianjin has shipped this year.

It is claimed that the ethylene tower of this operation is an important part of the cooperation project between Tianjin Yuyang Metal Equipment Co., Ltd. and Sinopec Engineering Construction Co., Ltd., Fujian Qizhou Gulei Refining and Chemical Integration Project. The project is the largest petrochemical project in cross-strait cooperation in the Chinese Straits. It has been included in the key projects of Sinopec and has been included in the key projects of the 13th Five-Year Development Plan of Fujian Province.

津滨网版权所有,未经书面授权禁止使用 违法和不良信息举报电话: 022-25204288 服务邮箱:jinbinwang2015@163.com
互联网新闻信息服务许可证:12120170004 备案序号:津ICP备11000547号津公网安备 12010702000020号

儿童色情信息举报专区